The Construction Process Of The Studio In Photographs

Bare Cellar with lifted york stone – 1 foot of earth dug out and drainage sump installed

IMAG0138

Stones laid back, concrete in-between to level. Drainage pipes installed around perimeter

IMAG0140

Walls and floor tanked with Newton Membrane system and new concrete floor installed

IMAG0189IMAG0190

Tanking and concreting the Control Room

IMAG0193

Building the frame for the room walls and hung ceiling

IMAG0247IMAG0244

60mm Rockwool packed in walls

IMAG024820130917_165441

50mm rockwool placed in the ceiling and below this an acoustic weighted barrier hung freely between the original and new ceilings

20130918_12242120131007_121748

50mm rockwool below the acoustic barrier mat

20130917_16125220131007_121754

20140116_154331

Showing the wall construction of 2 x 15mm Soundblock Plasterboard

20140116_154142

The boarded control room through the door

20140116_154343

The control room walls and ceiling skimmed

20151110_231227

Live room testing before decorating

20150902_232242

Finishing touches

20151001_00152520151014_212254